Assign one person to control the requirements version
The record owner gathers information from all departments and sends ACE C&T one consolidated version. This role does not need to decide every specification, but must know which items are confirmed and which remain pending. When the pallet, shift pattern or rack height changes, record who proposed and who approved the change.
Each version should include a date, quantity, scope of use and list of attached documents. Avoid basing the final quotation on new photos but a rack height taken from an old document. Linking to the detailed configuration form helps collect the initial data.
Suggested responsibility table for a rental file
| Task | Suggested lead | Collaborator / confirmer |
|---|---|---|
| Describe the requirement | Warehouse / production | Technical and safety teams |
| Verify the site | Site technical team | Warehouse and building management, if applicable |
| Compare quotation scope | Procurement | Warehouse, technical and finance teams |
| Approve and sign | Company-authorized person | Legal / procurement according to the organization structure |
| Handover and reconciliation | Warehouse; finance according to assigned work | Rental provider and technical team |
Use this checklist to prepare information and compare proposals. Operating specifications must be confirmed for the exact model and configuration against the manufacturer's instructions.
The warehouse describes the task; technical staff verify the conditions
The warehouse knows the goods, work rhythm, travel routes and when the forklift is needed. Technical staff verify the power supply, floor, infrastructure and other matters within their expertise. The safety team confirms operating conditions under the site's procedures.
All three teams need to understand the sample load and proposed configuration. The rental consultant supplies the forklift file and explains configuration feasibility, but does not approve every structure or activity at the user's premises.
Procurement compares quotations against the same approved scope
Before requesting quotations, agree on mandatory fields and negotiable items. When suppliers quote different configurations, send the differences back to the warehouse and technical team for confirmation rather than selecting on total price alone. State the machine hours, attachment, transport and support scope clearly.
A comparison table containing only the brand name and monthly price may omit conditions of use. Use the quotation reading guide to define the columns; technical and commercial decisions should have separate confirmers in line with the company's structure.
Handover requires someone authorized to record discrepancies
Prepare in advance a list of the forklift recipient, configuration inspector and minutes keeper. They need the approved plan and related documents. If there is a discrepancy, record the forklift code, specification and impact, then refer it to an authorized person before using the equipment outside the confirmed scope.
Do not merely sign for the quantity and leave the user department to discover the conditions later. Record the fault-reporting contact, operator instructions and documents received. Assign an owner to each corrective item and define how completion will be confirmed.
Keep a responsible contact after the forklift enters operation
Assign who reports incidents, who approves changes and who handles each reconciliation cycle. When personnel change, hand over the file together with the agreed technical contact details. Do not leave critical information only on the phone of someone who has moved to another department.
Discuss with ACE C&T from the outset who will be responsible for the forklift rental service. The responsibility table is a coordination tool; formal responsibilities and support scope must still be stated in the transaction's contract documents.
Rental terms and configuration-based quotations
ACE C&T rents out 100% new Hangcha forklifts with a minimum contract term of 12 months. Prices from VND 7,500,000 per truck per month apply to standard configurations, as confirmed on 07/10/2026; the model, operating hours, VAT, round-trip transport and maintenance scope are confirmed separately in the quotation. Do not treat the starting price as the rate for every configuration.
Submit a request to confirm the configuration and cost scope before approving the proposal.
Frequently asked questions
Should procurement finalize the configuration on its own?
Requirements that affect operation should be confirmed by the user department and the technical owner, in accordance with the company's authority structure.
Must the record owner also be the contract signatory?
Not necessarily. The version owner, technical approver and signatory may be different people; their authority should be recorded clearly.
Can this responsibility table replace contract terms?
No. It is an internal coordination guide; both parties must confirm transaction responsibilities in the appropriate documents.
QUOTATION FOR YOUR REQUIREMENTS
Get a forklift rental proposal based on your site
Send your goods type, actual load, rack height, aisle width, doorway height, shifts and operating location for a configuration proposal. ACE C&T rents 100% new Hangcha forklifts nationwide.
Contact: Mr. Lê Đình Lê · ledinhle@live.com
Depot address: Tu Son, Bac Ninh. Please call ahead to arrange a visit and confirm the handover location.
References: Confirmed ACE C&T service information · Hangcha Lithium forklift catalogue. Service information follows ACE C&T's Q&A dated 07/10/2026. Manufacturer documents were consulted on 12/10/2026; they do not establish truck availability, the capabilities of every model or a fixed response time.
Call 0904 070 313