
Site conditions to assess
- Distinguish response time, site-attendance time and time to restore operation.
- Define scheduled maintenance, wear items and responsibility for damage caused by operation.
- Agree on replacement trucks according to the job and availability, rather than using vague wording.
What the quotation should include
Quotations should specify the model or category, capacity, lift height, quantity, shifts, term, location, maintenance coverage, technical SLA, VAT and transport costs. ACE C&T accepts long-term contracts from 12 months.
Deployment proposal
Send warehouse layouts, pallet dimensions, maximum loads, rack heights, aisle widths and delivery schedules. From its main depot in Tu Son, Bac Ninh, ACE C&T advises on configurations and supplies projects nationwide.
GET A PROPOSAL
Request a configuration and quotation for your site
Hanoi office: NTT19-31, Van Phu Urban Area, Kien Hung Ward, Hanoi.
Main forklift depot: Tu Son, Bac Ninh.
Call 0904 070 313